Was just told that it's going to be in the morning before I get empty. This load is for GE coming to the power plant right outside Knoxville TN. First was told that this load was canceled but turned out it's another load that got canceled. Was told I'm a day early now, and they don't even know what yard it goes in. This isn't the first time I got screwed on a GE load. I'm starting to think GE dosen't know what they are doing