Time to start over again. Last time

Good point!!
Feels like he has more parts than keep time to get it installed.
Remember that it was at the dealerships body shop for the first 6 months last year. I'm going to try and get a few small things installed this week. If the weather doesn't get in the way. Mom said they had rain every day for the past 2 months
 
I reached out to LOD this morning about the rear bumper I ordered over Memorial Day weekend. The last email I got from LOD was that they were in the process of making a new batch, and that it was a 3 week leed time. They were sent to the powder coater last Friday. They are hopeful to get them back this week and ship out next week
 
I reached out to LOD this morning about the rear bumper I ordered over Memorial Day weekend. The last email I got from LOD was that they were in the process of making a new batch, and that it was a 3 week leed time. They were sent to the powder coater last Friday. They are hopeful to get them back this week and ship out next week
"3 weeks"
 
Just ordered 2 sets of these KC scene lights to go on the corners of the bedrack. I'll be getting the switch-pro installed in September or October when it cools off a bit in Mississippi. I'll install the lights at the same time. That's if they come in by then.
 

Attachments

  • Screenshot_2019-10-18_KC_HILITES_2_C-Series_C2_LED_Area_Flood_Light_System_-_328__15857.png
    Screenshot_2019-10-18_KC_HILITES_2_C-Series_C2_LED_Area_Flood_Light_System_-_328__15857.png
    392.3 KB · Views: 4
Top Bottom