CJ buggy build

20171219_140213.jpg finished sanding the inner race of a pair of setup bearings. Ready to figure out my carrier shims. I'm going to take the pinion to work and press on the bearing with the arbor press there.

Sent from my SM-G950U using WAYALIFE mobile app
 
I figured out a way to press on the pinion bearing without a press. Put the setup bearings on with the stock thickness shim pack. It's really tight getting the locker in with the truss.20171219_150731.jpg20171219_154654.jpg

Sent from my SM-G950U using WAYALIFE mobile app
 
Took a break from the gears to fix the fuel cell mounting holes. Then went back to the gears. They suck getting in and out with the truss there. After taking out almost all the shims. 1 had .007" backlash. Now going to check contact patch.20171219_190908.jpg20171219_193223.jpg

Sent from my SM-G950U using WAYALIFE mobile app
 
Finally got a contact patch I'm happy with and still kept backlash in tolerance. 20171223_150512.jpg now to press on the new bearings and set pinion bearing preload and torque the pinion nut. Happy to be almost done with the gears.

Sent from my SM-G950U using WAYALIFE mobile app
 
Got the carrier bearings, inner pinion race and outer pinion bearing pressed in. Torqued bearing caps and ring gear bolts. I'm out of rtv and I don't have a 33mm socket yet. The axle will have to wait to get finished until probably after Christmas. 20171223_211823.jpg

Sent from my SM-G950U using WAYALIFE mobile app
 
Top Bottom