Camper project

Speaking of time, how many hours do you have into it thus far?


Keep your head low and your powder dry.
 
Moving right along now...... finishing stretch. 12 volt system complete. All I need to do is hook up the sink drain and test the water system for leaks and fire up the hot water heater. Next is cabinet sliders, a cover for the water heater rubber floor mat and the fold down bed. :wings:
get-attachment.jpg12v2.jpg12v3.jpg12v4.jpg
 
Interior done! Water system works great and the hot water heater is awesome. :thumb::thankyou::wings::rock::whew: Just in time for JEEP BEACH!!!!!

fin 1.jpgfin 2.jpgfin 3.jpgfin 4.jpgfin5.jpg
 
That turned out great!!! Very expensive if you charge a decent hourly rate :D


Keep your head low and your powder dry.
 
Top Bottom